Product and semi-finished product details are defined and used.
Bills of materials, work centres, production operations and machines are defined and used, and routes can be defined.
Bills of materials with alternative materials can be defined.
Work orders and production requests can be created one by one or in bulk.
Bills of materials and operations can be customised and stored per work order.
Operations in a work order can be carried out at different times and in several parts.
Completions can be recorded one by one or in bulk, indirect costs are allocated to product cost with allocation keys or specified coefficients, and machine costs can be tracked.
Material Requirements Planning can be carried out.
Production inputs (raw materials, auxiliary materials and so on) and outputs (finished products, semi-finished products, scrap and so on) are tracked instantly and in detail.
Work orders are created from orders and production requests, the current production status is monitored and completions are followed.
Semi-finished products in the bill of materials are opened automatically, level by level, during the work order process.
Costs of products and semi-finished products made are calculated and tracked at the desired level of detail, and Cost Accounting records are created.
Finished product and raw material scrap and subcontracting can be tracked.